Difference between revisions of "WebCom Meeting 20070207"

From OSGeo
Jump to navigation Jump to search
 
(One intermediate revision by one other user not shown)
Line 12: Line 12:
 
* Change management procedures
 
* Change management procedures
  
Suggested:
+
=== Suggested ===
  - Site structure changes require motion
+
* Site structure changes require motion
  - Considerable page changes in the OSGeo area (not including areas allocated to others, such as VisCom, local chapters, projects) require discussion
+
* Considerable page changes in the OSGeo area (not including areas allocated to others, such as VisCom, local chapters, projects) require discussion
  - Minor changes can be done on an ad-hoc basis, notifying the mailing list when the changes are non-trivial (spelling errors, formatting, etc) at the author's judgement.
+
* Minor changes can be done on an ad-hoc basis, notifying the mailing list when the changes are non-trivial (spelling errors, formatting, etc) at the author's judgement.
  
Motion Guidelines:
+
=== Motion Guidelines ===
  - Topics of motions should be discussed on the mailing list before the motion is brought
+
* Topics of motions should be discussed on the mailing list before the motion is brought
  - A motion may be proposed by any committee member, and this counts as an automatic +1 vote
+
* A motion may be proposed by any committee member, and this counts as an automatic +1 vote
  - A motion may be seconded by any committee member, and this counts as an automatic +1 vote
+
* A motion may be seconded by any committee member, and this counts as an automatic +1 vote
  - A motion is carried if it receives at least two +1 votes and no -1 votes AND
+
* A motion is carried if it receives at least two +1 votes and no -1 votes AND
    - All members vote OR
+
** All members vote OR
    - 24 hours pass from the time of the original vote
+
** 24 hours pass from the time of the original vote
  - Extended lengths may be assigned to the voting period if desired for complex issues
+
** Extended lengths may be assigned to the voting period if desired for complex issues
 
    
 
    
We need some kind of deadlock override too.
+
* We need some kind of deadlock override too.
  
 
== Minutes ==
 
== Minutes ==
Line 33: Line 33:
  
 
http://logs.qgis.org/osgeo/%23osgeo.2007-02-07.log - from 10:00 - 11:00
 
http://logs.qgis.org/osgeo/%23osgeo.2007-02-07.log - from 10:00 - 11:00
 +
 +
 +
[[Category: WebCom]]
 +
[[Category: WebCom Meeting]]

Latest revision as of 11:00, 9 May 2007

OSGeo Website Committee Meeting

Meeting Info

Chair:  Jason
IRC:  #osgeo
When:  19:00 UTC on February 7th

Agenda Items

  • Change management procedures

Suggested

  • Site structure changes require motion
  • Considerable page changes in the OSGeo area (not including areas allocated to others, such as VisCom, local chapters, projects) require discussion
  • Minor changes can be done on an ad-hoc basis, notifying the mailing list when the changes are non-trivial (spelling errors, formatting, etc) at the author's judgement.

Motion Guidelines

  • Topics of motions should be discussed on the mailing list before the motion is brought
  • A motion may be proposed by any committee member, and this counts as an automatic +1 vote
  • A motion may be seconded by any committee member, and this counts as an automatic +1 vote
  • A motion is carried if it receives at least two +1 votes and no -1 votes AND
    • All members vote OR
    • 24 hours pass from the time of the original vote
    • Extended lengths may be assigned to the voting period if desired for complex issues
  • We need some kind of deadlock override too.

Minutes

See IRC Logs:

http://logs.qgis.org/osgeo/%23osgeo.2007-02-07.log - from 10:00 - 11:00