OTB Project Incubation Status
Revision as of 04:09, 18 December 2013 by Wiki-Grizonnetm (talk | contribs)
General
- Has the project been approved for incubation by the OSGeo board?
Yes. Announcement was made publicly on December 17, 2013.
- Has an Incubation Mentor been assigned to the project?
Yes. Landon Blake.
Infrastructure Transition
- Has the projectname.osgeo.org domain been populated with the projects web presence? If not why, and has the project page got a prominent link to the real home?
No. An existing web page exists: http://orfeo-toolbox.org/otb/
- Is the OSGeo bug tracker being used for the project? If not, why? Is the OSGeo mailing list manager (http://lists.osgeo.org/) being used for the project? If not, why?
No. An existing bug tracker is being used by the project: http://bugs.orfeo-toolbox.org
- Is the OSGeo SVN being used for the project? If not, why?
No. An existing version control system is being used for the project: http://hg.orfeo-toolbox.org/OTB
- Are binary and source downloads available from http://download.osgeo.org ? If not, why?
No. Downloads are available from the existing web site: http://orfeo-toolbox.org/otb/download.html
Community Functioning
- Is there a functioning user support mechanisms (ie. mailing list)?
- Are source and binary downloads for the package available?
- Has a Project Steering Committee been formed, and given control of the project?
- Does the Project Steering Committee have documentation on project procedures for PSC decisions, contributor guidelines?
- How many active developers are there? Are they from multiple organizations? Indicate number and some organizations involved.
Foundation Membership
- Have project documents been updated to reflect membership in the foundation, and the relationship of the project to the foundation? If not, indicate when this will occur.
- Has an effort been made to brand the project web site with OSGeo foundation web styling and branding marks? If not, indicate what is planned.
Code Copyright Review
- Has a Code Provenance Review document been prepared for the project?
- Have issues raised in the provenance review been adequately addressed? Indicate outstanding issues.
- Are Commiter Responsibilities Guidelines covering legal issues in place?