Difference between revisions of "Migration Tasks and Milestones"

From OSGeo
Jump to navigation Jump to search
Line 4: Line 4:
 
* Negotiate and Sign Contract with PEER1 [Tyler]
 
* Negotiate and Sign Contract with PEER1 [Tyler]
  
Arrange for dump of CollabNet database (Geoff)
+
 
 +
== Arrange Dump of CollabNet Databases [12/01/06] ==
 +
Arrange with CollabNet (Geoff)
  
 
High priority:
 
High priority:
Line 46: Line 48:
 
* Cleanup Migration Issues [Shawn, All]
 
* Cleanup Migration Issues [Shawn, All]
 
* Develop Long Term Drupal Navigation, Organization, Etc. [Tyler to Coordinate]
 
* Develop Long Term Drupal Navigation, Organization, Etc. [Tyler to Coordinate]
 +
 +
== Risks ==
 +
 +
CollabNet database dumps
 +
 +
Migrating user databases to LDAP
 +
 +
Configuring LDAP

Revision as of 05:48, 24 November 2006

This page is intended to describe the tasks and milestones for the Infrastructure Migration project. We'll also use this to track status as we move toward our end of December deadline.

Servers online at PEER1 [12/01/06]

  • Negotiate and Sign Contract with PEER1 [Tyler]


Arrange Dump of CollabNet Databases [12/01/06]

Arrange with CollabNet (Geoff)

High priority: User database, Maillist and archives, SVN including history

Low priority: Groups

Install and Configure Key Services [12/08/06]

  • LAMP [Shawn]
  • LDAP [Shawn]
  • Drupal [Shawn]
  • MailMan [Shawn]
  • SVN, Trac [Shawn]

Migrate Services and Content [12/20/06]

  • Develop Scripts to Migrate CollabNet Users to LDAP [Shawn]
  • Develop Scripts to Migrate CollabNet Mailing Lists to MailMan [Shawn]
  • Develop Scripts for SVN Dump/Load [Shawn]
  • Develop Basic Drupal Navigation (e.g. Clone Existing) [Tyler to Coordinate]
  • Migrate OSGeo Site Content [Tyler to Coordinate]
  • Migrate MapGuide Project Content [Bob to Coordinate]
  • Migrate FDO Project Content [Bob to Coordinate]

Go Live Phase 1 - Basic Site [12/22/06]

  • Run Migration Scripts [Shawn]
  • Change DNS for osgeo.org [Shawn]
At this point the OSGeo Web Site and Mailing lists will be up and running on the new infrastructure.

Go Live Phase 2 - SVN [12/29/06]

  • Migrate SVN Repositories (MapGuide, FDO, Mapbender) [Shawn]
  • Extract Project Tracker Artifacts e.g. Bugs as XML (MapGuide and FDO) [Shawn]
At this point the SVN instances for MapGuide, FDO, and Mapbender will be live on the new infrastructure.

Go Live Phase 3 - Trac and Cleanup [01/31/07]

  • Develop scripts to import Project Tracker Artifacts into Trac [Shawn]
  • Cleanup Migration Issues [Shawn, All]
  • Develop Long Term Drupal Navigation, Organization, Etc. [Tyler to Coordinate]

Risks

CollabNet database dumps

Migrating user databases to LDAP

Configuring LDAP