Difference between revisions of "FOSS4G2008 Workshops"
Wiki-Burnie (talk | contribs) |
|||
(30 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | |||
== Introduction == | == Introduction == | ||
The FOSS4G2008 Workshop Committee is responsible for the organization of both Workshops and Labs. Workshops are 3-hour classroom sessions, and Labs are 90-minute classes. The committee reports to the FOSS4G2008 Conference Committee. | The FOSS4G2008 Workshop Committee is responsible for the organization of both Workshops and Labs. Workshops are 3-hour classroom sessions, and Labs are 90-minute classes. The committee reports to the FOSS4G2008 Conference Committee. | ||
== FOSS4G Workshop Committee Members == | == FOSS4G Workshop Committee Members == | ||
− | * [[User: | + | * [[User:burnie | Burnie Nawn (Coordinator)]] |
− | + | * [[User:Gfleming| Gavin Fleming]] | |
− | * [[User: | + | * [[User:Gmcferren | Graeme McFerren]] |
− | * [[User: | ||
* [[User:Jmckenna | Jeff McKenna]] | * [[User:Jmckenna | Jeff McKenna]] | ||
− | |||
− | |||
== Next Committee Meeting == | == Next Committee Meeting == | ||
The date/time for the next meeting is tentative | The date/time for the next meeting is tentative | ||
− | * date: | + | * date: |
− | * time: To be confirmed[] | + | * time: To be confirmed[] |
* meeting will be via [[]] | * meeting will be via [[]] | ||
* Agenda: | * Agenda: | ||
Line 22: | Line 17: | ||
== Previous Committee Meetings == | == Previous Committee Meetings == | ||
− | == List of workshop submissions == | + | == List of workshop and lab submissions == |
− | [[ | + | [[FOSS4G2008_Workshop_Submissions#NOTE]] |
+ | |||
+ | == Final list of workshops and labs == | ||
+ | [[FOSS4G2008_Workshops_and_Labs]] | ||
== Criteria used by the workshop committee to review workshop submissions == | == Criteria used by the workshop committee to review workshop submissions == | ||
Line 30: | Line 28: | ||
## makes use of software that is both "free" and "open source" | ## makes use of software that is both "free" and "open source" | ||
# submission's technical requirements can be met by the conference facilities | # submission's technical requirements can be met by the conference facilities | ||
− | # | + | # likelihood of a quality workshop: |
## successful workshop presented at prior FOSS4G conference | ## successful workshop presented at prior FOSS4G conference | ||
## expertise of the workshop presenter in the workshop subject matter | ## expertise of the workshop presenter in the workshop subject matter | ||
− | ## any relevant input from workshop evaluations collected by | + | ## any relevant input from workshop evaluations collected by FOSS4G2007, or personal experience of workshops presented by the presenter(s) at other conferences |
## demonstrates practical applications | ## demonstrates practical applications | ||
# expected level of interest in the workshop topic | # expected level of interest in the workshop topic | ||
Line 49: | Line 47: | ||
== Timetable for workshop submissions review process == | == Timetable for workshop submissions review process == | ||
+ | 6-9 June; assessent to be completed and workshop presenters notified. | ||
+ | immediately thereafter, workshops and other activities are to be put 'on offer' to registrants. | ||
== Workshops Notes == | == Workshops Notes == | ||
− | ''' | + | === Workshop Duration and Scheduling === |
+ | |||
+ | Refer to the master programme at [[FOSS4G_2008_Programme]]. | ||
+ | The table below is only an indication for placement of labs and workshops. | ||
+ | |||
+ | Workshop and Lab Venues: | ||
+ | * '''Venue1''' = CTICC Rooftop Terrace | ||
+ | ** 100 Seats | ||
+ | ** 50 Computers | ||
+ | ** Hired For: 29/30/1/2/3 | ||
+ | * '''Venue2''' = CTICC Room 1.40 | ||
+ | ** 96 Seats | ||
+ | ** 48 Computers | ||
+ | ** Hired For: 29/30/1/2/3 | ||
+ | * '''Venue3''' = CTICC Auditorium | ||
+ | ** hundreds of seats, but need to limit to say 40; CTICC will provide tables on top of seats + power supply | ||
+ | ** no computers, bring own | ||
+ | ** Hired For: 29/2 | ||
+ | * '''Venue4''' = University of Cape Town Geomatics Lab | ||
+ | ** 44 Seats | ||
+ | ** 22 Computers | ||
+ | ** Available 29/3 | ||
+ | |||
− | === | + | {| border="1" |
+ | |+ Workshop and Lab Slots as currently proposed. | ||
+ | !TIME SLOT !!MON Venue1 !! MON Venue2 !! MON Venue3 !! MON Venue4 !! TUE Venue1 !! TUE Venue2 !! WED Venue1 !! WED Venue2 !! THU Venue1 !! THU Venue2 !! FRI Venue1 !! FRI Venue2 !! FRI Venue4 | ||
+ | |- | ||
+ | |bgcolor="lightgray"|8am - 10am || bgcolor="#1E90FF"|ws1 || bgcolor="#1E90FF"|ws2 || bgcolor="#1E90FF"|ws3 || bgcolor="#1E90FF"|ws4 || bgcolor="#ABCDEF"|lab1 || bgcolor="#ABCDEF"|lab2 || bgcolor="#ABCDEF"|lab9 || bgcolor="#ABCDEF"|lab10 || bgcolor="#ABCDEF"|lab17 || bgcolor="#ABCDEF"|lab18 || bgcolor="#1E90FF"|ws5 || bgcolor="#1E90FF"|ws6 || bgcolor="#1E90FF"|ws7 | ||
+ | |- | ||
+ | |bgcolor="lightgray"|10:30am - 12pm || bgcolor="#1E90FF"|ws1 || bgcolor="#1E90FF"|ws2 || bgcolor="#1E90FF"|ws3 || bgcolor="#1E90FF"|ws4 || bgcolor="#ABCDEF"|lab3 || bgcolor="#ABCDEF"|lab4 || bgcolor="#ABCDEF"|lab11 || bgcolor="#ABCDEF"|lab12 || bgcolor="#ABCDEF"|lab19 || bgcolor="#ABCDEF"|lab20 || bgcolor="#1E90FF"|ws5 || bgcolor="#1E90FF"|ws6 || bgcolor="#1E90FF"|ws7 | ||
+ | |- | ||
+ | |bgcolor="lightgray"|1pm - 2:30pm || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary || bgcolor="#ABCDEF"|lab5 || bgcolor="#ABCDEF"|lab5 || bgcolor="#ABCDEF"|lab13 || bgcolor="#ABCDEF"|lab14 || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary || bgcolor="#1E90FF"|ws8 || bgcolor="#1E90FF"|ws9 || bgcolor="#1E90FF"|ws10 | ||
+ | |- | ||
+ | |bgcolor="lightgray"|3pm - 4:30pm || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary || bgcolor="#ABCDEF"|lab7 || bgcolor="#ABCDEF"|lab8 || bgcolor="#ABCDEF"|lab15 || bgcolor="#ABCDEF"|lab16 || bgcolor="#FF4500"|Plenary || bgcolor="#FF4500"|Plenary ||bgcolor="#1E90FF"| ws8 || bgcolor="#1E90FF"|ws9 || bgcolor="#1E90FF"|ws10 | ||
+ | |- | ||
+ | |bgcolor="lightgray"|5:30pm - 8:30pm || bgcolor="#FF4500"|Cocktail || bgcolor="#FF4500"|Cocktail || bgcolor="#FF4500"|Cocktail || bgcolor="#FF4500"|Cocktail || bgcolor="#FFBF00"|maybe || bgcolor="#FFBF00"|maybe || bgcolor="#FF4500"|Gala || bgcolor="#FF4500"|Gala || bgcolor="#FFBF00"|maybe || bgcolor="#FFBF00"|maybe || bgcolor="#FF4500"|OSGEO? || bgcolor="#FF4500"|OSGEO? || bgcolor="#FF4500"|OSGEO? | ||
+ | |} | ||
− | + | So, 6 workshops (3-4 hours) and 20 labs (1.5 hours) are planned for. Most submitted proposals are for workshops as opposed to labs (27:16). FOSS4G2007 had 12 workshops and 16 labs. That seems more sensible. So, what are the options? | |
+ | * We can up the workshops to 8 (Thurs) or 10 (Tues and Thurs) by holding evening sessions from, say, 6-9pm (will attendees come? will presenters want to present then? would it be unfair to make these slots for deeply technical content, e.g. coding?), but that may still not be enough. We have the venues with computers, let's use them if we can in otherwise dead time... | ||
+ | **Gavin: I think Thurs night is good option as main conference is over, Tues is still open for socialising. Full conference package still includes just three 'slots' so if someone now wants to do four (Mon morning, Thurs eve, and two on Fri) they'll need to pay for an extra activity. | ||
+ | * We can break up Venue2 into 2 smaller venues and run a workshop parallel to the 2 lab threads. This means that 25% less people can attend. With evening slots, this would bring workshops up to 13 (Gavin: not a good option - complicates registration packages) | ||
+ | * We can try for offsite venues (maybe without even having to pay for them, though bussing participants would still cost) | ||
+ | **Gavin: we can cover bussing. We can offer free attendance by some staff or students in lieu of payment.. | ||
+ | ** Centre for High Performance Computing (backup - can only handle a small workshop of max 18 people) | ||
+ | ** City of Cape Town GIS Lab | ||
+ | ** UCT Geomatics Lab | ||
+ | ** University of the Western Cape Computer Lab | ||
+ | * We can try to a secure slightly bigger second venue at the CTICC to be split up - no, it is booked out | ||
+ | * We will use the Auditorium on Monday morning prior to Plenary - can hold a "bring your own computer" workshop. | ||
=== Hardware === | === Hardware === | ||
Line 68: | Line 114: | ||
=== Questions for Organising Committee === | === Questions for Organising Committee === | ||
* Number and dimension of rooms, tables (how many PCs /people can we fit in a room) | * Number and dimension of rooms, tables (how many PCs /people can we fit in a room) | ||
+ | ** Venue 1 is Roof Terrace and can hold 100 people (50 PCs) | ||
+ | ** Venue 2 is Room 1.40 and can hold 96 people (48 PCs) | ||
+ | ** Venue 2 can be split into two rooms holding 24 people each (reduced config apparently due to strict fire and building regulations). | ||
+ | ***Gavin: how high can we push this by reconfiguring rooms and desks? | ||
+ | ****Graeme: cannot be done - these are the allowed sizes - PeopleSA has fought this battle already. Also, there are no bigger venues available for workshops at the CTICC. | ||
+ | ** Venue 3 is the main Auditorium. Desks can be fitted for a small cost and power supplied. WiFi access to internet is available. This would be a workshop where attendess supplied own notebook computers, for it would have to be rapidly disassembled afterwards in prep for Opening Plenary. | ||
+ | * Can the Workshops and labs be themed? | ||
+ | ** With only two (maybe three venues) it is tricky - perhaps into 1) Desktop GIS and Analysis, 2) Internet GIS | ||
=== Feedback from Past Conferences (things to note) === | === Feedback from Past Conferences (things to note) === | ||
Line 74: | Line 128: | ||
* LiveCD for linux workshops very successful | * LiveCD for linux workshops very successful | ||
* grouping workshops by room "theme" successful (MapServer room, GRASS room, ...) | * grouping workshops by room "theme" successful (MapServer room, GRASS room, ...) | ||
− | + | ||
− | |||
− | |||
− | |||
[[Category:FOSS4G_Workshops]] | [[Category:FOSS4G_Workshops]] |
Latest revision as of 04:01, 20 July 2008
Introduction
The FOSS4G2008 Workshop Committee is responsible for the organization of both Workshops and Labs. Workshops are 3-hour classroom sessions, and Labs are 90-minute classes. The committee reports to the FOSS4G2008 Conference Committee.
FOSS4G Workshop Committee Members
Next Committee Meeting
The date/time for the next meeting is tentative
- date:
- time: To be confirmed[]
- meeting will be via [[]]
- Agenda:
Previous Committee Meetings
List of workshop and lab submissions
FOSS4G2008_Workshop_Submissions#NOTE
Final list of workshops and labs
Criteria used by the workshop committee to review workshop submissions
- meets conference mandate:
- matches with the themes of the conference
- makes use of software that is both "free" and "open source"
- submission's technical requirements can be met by the conference facilities
- likelihood of a quality workshop:
- successful workshop presented at prior FOSS4G conference
- expertise of the workshop presenter in the workshop subject matter
- any relevant input from workshop evaluations collected by FOSS4G2007, or personal experience of workshops presented by the presenter(s) at other conferences
- demonstrates practical applications
- expected level of interest in the workshop topic
Scoring
The range of scores to be used is 0 through 5:
0 = does not meet any of the criteria 1 = barely meets some of the criteria, and doesn't meet some of the criteria 3 = average 5 = meets or exceeds all of the criteria
The goal is to end up with a score in the range of 0-5 for the workshop. Two ways to do the scoring:
- Use the provided spreadsheet, which allows for a score for each criterion. Divide the "Total Score" by 4 to get the 'score for the workshop'. Doing it this way makes it easy to see any workshops that received a zero for any criterion. Despite the 'total score', workshops that have a zero score for any criterion deserve further examination as to their suitability for the conference.
- Use the provided spreadsheet, but just assign an overall score of 0-5 for the workshop. If, as part of doing this, you think a workshop would score zero on any criterion, make a note, and bring it up in the discussions, because workshops that have a zero score for any criterion deserve further examination as to their suitability for the conference.
Timetable for workshop submissions review process
6-9 June; assessent to be completed and workshop presenters notified. immediately thereafter, workshops and other activities are to be put 'on offer' to registrants.
Workshops Notes
Workshop Duration and Scheduling
Refer to the master programme at FOSS4G_2008_Programme. The table below is only an indication for placement of labs and workshops.
Workshop and Lab Venues:
- Venue1 = CTICC Rooftop Terrace
- 100 Seats
- 50 Computers
- Hired For: 29/30/1/2/3
- Venue2 = CTICC Room 1.40
- 96 Seats
- 48 Computers
- Hired For: 29/30/1/2/3
- Venue3 = CTICC Auditorium
- hundreds of seats, but need to limit to say 40; CTICC will provide tables on top of seats + power supply
- no computers, bring own
- Hired For: 29/2
- Venue4 = University of Cape Town Geomatics Lab
- 44 Seats
- 22 Computers
- Available 29/3
TIME SLOT | MON Venue1 | MON Venue2 | MON Venue3 | MON Venue4 | TUE Venue1 | TUE Venue2 | WED Venue1 | WED Venue2 | THU Venue1 | THU Venue2 | FRI Venue1 | FRI Venue2 | FRI Venue4 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8am - 10am | ws1 | ws2 | ws3 | ws4 | lab1 | lab2 | lab9 | lab10 | lab17 | lab18 | ws5 | ws6 | ws7 |
10:30am - 12pm | ws1 | ws2 | ws3 | ws4 | lab3 | lab4 | lab11 | lab12 | lab19 | lab20 | ws5 | ws6 | ws7 |
1pm - 2:30pm | Plenary | Plenary | Plenary | Plenary | lab5 | lab5 | lab13 | lab14 | Plenary | Plenary | ws8 | ws9 | ws10 |
3pm - 4:30pm | Plenary | Plenary | Plenary | Plenary | lab7 | lab8 | lab15 | lab16 | Plenary | Plenary | ws8 | ws9 | ws10 |
5:30pm - 8:30pm | Cocktail | Cocktail | Cocktail | Cocktail | maybe | maybe | Gala | Gala | maybe | maybe | OSGEO? | OSGEO? | OSGEO? |
So, 6 workshops (3-4 hours) and 20 labs (1.5 hours) are planned for. Most submitted proposals are for workshops as opposed to labs (27:16). FOSS4G2007 had 12 workshops and 16 labs. That seems more sensible. So, what are the options?
- We can up the workshops to 8 (Thurs) or 10 (Tues and Thurs) by holding evening sessions from, say, 6-9pm (will attendees come? will presenters want to present then? would it be unfair to make these slots for deeply technical content, e.g. coding?), but that may still not be enough. We have the venues with computers, let's use them if we can in otherwise dead time...
- Gavin: I think Thurs night is good option as main conference is over, Tues is still open for socialising. Full conference package still includes just three 'slots' so if someone now wants to do four (Mon morning, Thurs eve, and two on Fri) they'll need to pay for an extra activity.
- We can break up Venue2 into 2 smaller venues and run a workshop parallel to the 2 lab threads. This means that 25% less people can attend. With evening slots, this would bring workshops up to 13 (Gavin: not a good option - complicates registration packages)
- We can try for offsite venues (maybe without even having to pay for them, though bussing participants would still cost)
- Gavin: we can cover bussing. We can offer free attendance by some staff or students in lieu of payment..
- Centre for High Performance Computing (backup - can only handle a small workshop of max 18 people)
- City of Cape Town GIS Lab
- UCT Geomatics Lab
- University of the Western Cape Computer Lab
- We can try to a secure slightly bigger second venue at the CTICC to be split up - no, it is booked out
- We will use the Auditorium on Monday morning prior to Plenary - can hold a "bring your own computer" workshop.
Hardware
Room Availability
Software Installation
Other
Questions for Organising Committee
- Number and dimension of rooms, tables (how many PCs /people can we fit in a room)
- Venue 1 is Roof Terrace and can hold 100 people (50 PCs)
- Venue 2 is Room 1.40 and can hold 96 people (48 PCs)
- Venue 2 can be split into two rooms holding 24 people each (reduced config apparently due to strict fire and building regulations).
- Gavin: how high can we push this by reconfiguring rooms and desks?
- Graeme: cannot be done - these are the allowed sizes - PeopleSA has fought this battle already. Also, there are no bigger venues available for workshops at the CTICC.
- Gavin: how high can we push this by reconfiguring rooms and desks?
- Venue 3 is the main Auditorium. Desks can be fitted for a small cost and power supplied. WiFi access to internet is available. This would be a workshop where attendess supplied own notebook computers, for it would have to be rapidly disassembled afterwards in prep for Opening Plenary.
- Can the Workshops and labs be themed?
- With only two (maybe three venues) it is tricky - perhaps into 1) Desktop GIS and Analysis, 2) Internet GIS
Feedback from Past Conferences (things to note)
- overcrowded workshops are bad
- registrants could possibly list their "top 4" workshop selections
- LiveCD for linux workshops very successful
- grouping workshops by room "theme" successful (MapServer room, GRASS room, ...)