Difference between revisions of "FOSS4G 2010 Workshops meetings"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
== Decisions made == | == Decisions made == | ||
− | ( | + | * FTP access: 63 Gb available. Folders there now for each workshop, with a 'data', 'printing', and 'software' folder in each. Connection params will be sent to presenters. |
− | + | * Jeff & Oscar will prepare a doc w/instructions and system details (vgr network drive paths, admin access) for presenters, and distribute it on May 10. | |
+ | * Will not provide printed materials for Tutorials. But will facilitate FTP access to upload docs, that will be linked from 2010.foss4g.org. Deadline for uploading, 7 july. | ||
+ | * There will be 7 workshop volunteers for workshops, preferently local students. | ||
+ | * Local geodata: Just made a call in OSGeo-es and Barcelona lists. If no one takes this task, we will forget it. | ||
+ | * Next IRC session in three weeks (2 may), same hour, same place. | ||
== IRC Log == | == IRC Log == |
Revision as of 09:36, 29 April 2010
IRC meetings at #foss4g channel, irc.freenode.net
Next IRC meeting
Agenda
- (TBD)
2nd IRC meeting
Agenda
- LOC decision on budget for printed materials (tutorials).
- FTP Accounts. Status.
- Local geodata & volunteers. Status.
Decisions made
- FTP access: 63 Gb available. Folders there now for each workshop, with a 'data', 'printing', and 'software' folder in each. Connection params will be sent to presenters.
- Jeff & Oscar will prepare a doc w/instructions and system details (vgr network drive paths, admin access) for presenters, and distribute it on May 10.
- Will not provide printed materials for Tutorials. But will facilitate FTP access to upload docs, that will be linked from 2010.foss4g.org. Deadline for uploading, 7 july.
- There will be 7 workshop volunteers for workshops, preferently local students.
- Local geodata: Just made a call in OSGeo-es and Barcelona lists. If no one takes this task, we will forget it.
- Next IRC session in three weeks (2 may), same hour, same place.
IRC Log
http://logs.qgis.org/foss4g/%23foss4g.2010-04-29.log
1st IRC meeting
Agenda
As Jeff suggested, we will try to fix a calendar for the next important steps:
- Plan for a deadline for presenters to provide full software requirements (versions etc)
- Deadline for submitting materials
- Plan for the machine setup
Decisions made
- Make a wiki page to track all of the meetings (this one).
- Create OSGeo FTP account, where instructors will put materials. One folder each workshop, with three subfolders: software; install and testing instructions; print materials. (Jeff McKenna's task).
- Deadline for software and materials: 5th July. (August is specially improductive @ Spain).
- Virtualbox client will be installed in all computers.
- LOC should be aware that there's a need for 1 volunteer per classroom (access control, materials delivery), and handy technicians from the university during workshops.
- LOC should decide on budget for tutorial printed materials.
- Tutorials as hands-on experiences, with participants bringing their own laptop/netbook, don't succeed. It is better that tutorials are conceived as extended presentations, that can be followed without the software running in own's machine.
- Oscar Fonts proposal: Try to use local geodatasets. Local volunteers are needed. Make a call @OSGeo-es and see.
- Next meeting will be in a week +2 hours, so Eastern Canada people can participate.