Difference between revisions of "FOSS4G 2010 Workshops meetings"
Jump to navigation
Jump to search
(8 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
= Next IRC meeting = | = Next IRC meeting = | ||
− | + | Not set. | |
== Agenda == | == Agenda == | ||
− | * ( | + | * (add...) |
+ | |||
+ | |||
+ | = 3rd IRC meeting = | ||
+ | |||
+ | [http://www.timeanddate.com/worldclock/fixedtime.html?year=2010&month=5&day=27&hour=16&min=0&sec=0 May 27 2010, 1600 UTC] | ||
+ | |||
+ | == Agenda == | ||
+ | |||
+ | * Live USB: | ||
+ | ** An OSGeo Live DVD (or USB) will be handed out to every delegate at FOSS4G, and can be used either from the DVD or as a pre-installed Virtual Machine for workshops. | ||
+ | ** The LiveDVD team would like to know how we can help workshop presenters make use of the LiveDVD. | ||
+ | ** Do you want training material on the DVD? | ||
+ | ** Do you want to set up specific examples? | ||
+ | * Local (Catalan) Geodataset. | ||
+ | |||
+ | == Decisions made == | ||
+ | |||
+ | Not much. | ||
+ | |||
+ | * No LiveDVD people in the meeting. Try to set the next meeting in an hour suitable for australians to attend. | ||
+ | * Local (catalan) Geodataset still not available. Ivan Sanchez will try with spanish IGN data. | ||
+ | |||
+ | == IRC Log == | ||
+ | |||
+ | http://logs.qgis.org/foss4g/%23foss4g.2010-05-27.log (till 08:54:24) | ||
Line 24: | Line 49: | ||
* FTP access: 63 Gb available. Folders there now for each workshop, with a 'data', 'printing', and 'software' folder in each. Connection params will be sent to presenters. | * FTP access: 63 Gb available. Folders there now for each workshop, with a 'data', 'printing', and 'software' folder in each. Connection params will be sent to presenters. | ||
* Jeff & Oscar will prepare a doc w/instructions and system details (vgr network drive paths, admin access) for presenters, and distribute it on May 10. | * Jeff & Oscar will prepare a doc w/instructions and system details (vgr network drive paths, admin access) for presenters, and distribute it on May 10. | ||
− | * Will not provide printed materials for Tutorials. But will facilitate FTP access to upload docs, that will be linked from 2010.foss4g.org. Deadline for | + | * Will not provide printed materials for Tutorials. But will facilitate FTP access to upload docs, that will be linked from 2010.foss4g.org. Deadline for tutorial materials, same as workshops: July 7. |
− | * There will be 7 | + | * There will be 7 volunteers at workshops, preferently local students. |
* Local geodata: Just made a call in OSGeo-es and Barcelona lists. If no one takes this task, we will forget it. | * Local geodata: Just made a call in OSGeo-es and Barcelona lists. If no one takes this task, we will forget it. | ||
* Next IRC session in three weeks (2 may), same hour, same place. | * Next IRC session in three weeks (2 may), same hour, same place. | ||
Line 64: | Line 89: | ||
[[Category:FOSS4G2010]] | [[Category:FOSS4G2010]] | ||
− |
Latest revision as of 02:31, 23 February 2015
IRC meetings at #foss4g channel, irc.freenode.net
Next IRC meeting
Not set.
Agenda
- (add...)
3rd IRC meeting
Agenda
- Live USB:
- An OSGeo Live DVD (or USB) will be handed out to every delegate at FOSS4G, and can be used either from the DVD or as a pre-installed Virtual Machine for workshops.
- The LiveDVD team would like to know how we can help workshop presenters make use of the LiveDVD.
- Do you want training material on the DVD?
- Do you want to set up specific examples?
- Local (Catalan) Geodataset.
Decisions made
Not much.
- No LiveDVD people in the meeting. Try to set the next meeting in an hour suitable for australians to attend.
- Local (catalan) Geodataset still not available. Ivan Sanchez will try with spanish IGN data.
IRC Log
http://logs.qgis.org/foss4g/%23foss4g.2010-05-27.log (till 08:54:24)
2nd IRC meeting
Agenda
- LOC decision on budget for printed materials (tutorials).
- FTP Accounts. Status.
- Local geodata & volunteers. Status.
Decisions made
- FTP access: 63 Gb available. Folders there now for each workshop, with a 'data', 'printing', and 'software' folder in each. Connection params will be sent to presenters.
- Jeff & Oscar will prepare a doc w/instructions and system details (vgr network drive paths, admin access) for presenters, and distribute it on May 10.
- Will not provide printed materials for Tutorials. But will facilitate FTP access to upload docs, that will be linked from 2010.foss4g.org. Deadline for tutorial materials, same as workshops: July 7.
- There will be 7 volunteers at workshops, preferently local students.
- Local geodata: Just made a call in OSGeo-es and Barcelona lists. If no one takes this task, we will forget it.
- Next IRC session in three weeks (2 may), same hour, same place.
IRC Log
http://logs.qgis.org/foss4g/%23foss4g.2010-04-29.log
1st IRC meeting
Agenda
As Jeff suggested, we will try to fix a calendar for the next important steps:
- Plan for a deadline for presenters to provide full software requirements (versions etc)
- Deadline for submitting materials
- Plan for the machine setup
Decisions made
- Make a wiki page to track all of the meetings (this one).
- Create OSGeo FTP account, where instructors will put materials. One folder each workshop, with three subfolders: software; install and testing instructions; print materials. (Jeff McKenna's task).
- Deadline for software and materials: 5th July. (August is specially improductive @ Spain).
- Virtualbox client will be installed in all computers.
- LOC should be aware that there's a need for 1 volunteer per classroom (access control, materials delivery), and handy technicians from the university during workshops.
- LOC should decide on budget for tutorial printed materials.
- Tutorials as hands-on experiences, with participants bringing their own laptop/netbook, don't succeed. It is better that tutorials are conceived as extended presentations, that can be followed without the software running in own's machine.
- Oscar Fonts proposal: Try to use local geodatasets. Local volunteers are needed. Make a call @OSGeo-es and see.
- Next meeting will be in a week +2 hours, so Eastern Canada people can participate.