Difference between revisions of "Geodata Committee Ninth Meeting"

From OSGeo
Jump to navigation Jump to search
m
 
m
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
== Meeting Info ==
 +
 +
  Chair: Jo Walsh
 +
  IRC: [irc://irc.freenode.net/osgeo #osgeo channel on irc.freenode.org] (or via [http://irc.telascience.org Web based IRC client])
 +
  Date: 2006-August-30 (at least in the Americas and Europe)
 +
  Time: 1600 GMT / 1100 East Coast / 1700 Europe ([http://timeanddate.com/worldclock/fixedtime.html?month=11&day=02&year=2006&hour=16&min=0&sec=0 fixed time])
  
 
== Agenda ==
 
== Agenda ==
  
 
* Report of current status of available systems at Telascience
 
* Report of current status of available systems at Telascience
 +
** [[Geodata processing at telascience.org]] was Markus' progress
 +
** [[SAC Service Status]] represents anything like reality?
 +
 
* How metadata collecting interface is holding up to peoples data hosting reqs.
 
* How metadata collecting interface is holding up to peoples data hosting reqs.
 
* Assessment of what data sets are available now  
 
* Assessment of what data sets are available now  
Line 11: Line 20:
  
 
* Plans to connect more with FAO GeoNetwork espec. when that project enters OSGeo incubation
 
* Plans to connect more with FAO GeoNetwork espec. when that project enters OSGeo incubation
 +
 +
[[Category:Public Geospatial Data Committee]]

Latest revision as of 07:34, 23 August 2007

Meeting Info

 Chair: Jo Walsh 
 IRC: #osgeo channel on irc.freenode.org (or via Web based IRC client)
 Date: 2006-August-30 (at least in the Americas and Europe)
 Time: 1600 GMT / 1100 East Coast / 1700 Europe (fixed time)

Agenda

  • How metadata collecting interface is holding up to peoples data hosting reqs.
  • Assessment of what data sets are available now
  • Assessment of what data sets people are anxious to get into redistribution
  • VMap0-clean - has it been possible to get any more clarity from ESRI about the extent of their claimed IP in the political boundary layer
    • ... in working on a cleaned-up distribution that can be re-annotated
  • Plans to connect more with FAO GeoNetwork espec. when that project enters OSGeo incubation