Difference between revisions of "IncCom Report24"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
* 2013 Q4 Report withdrawn due to holidays | * 2013 Q4 Report withdrawn due to holidays | ||
* Board request to tone down emphasis of SAC resources in status document and initial questionair | * Board request to tone down emphasis of SAC resources in status document and initial questionair | ||
− | ** Initial attempt at combining Status Document and evaluation criteria at [Project_Status_Draft]. | + | ** Initial attempt at combining Status Document and evaluation criteria at [[Project_Status_Draft]]. |
+ | ** Resulting document clearly marks SAC resources as optional and available on request. | ||
= Incubation = | = Incubation = |
Latest revision as of 03:09, 6 April 2014
Incubation Status report for Q3 2013.
Incubation Committee
Low activity, projects waiting due to lack of OSGeo volunteers to act as mentor.
Activities:
- 2013 Q4 Report withdrawn due to holidays
- Board request to tone down emphasis of SAC resources in status document and initial questionair
- Initial attempt at combining Status Document and evaluation criteria at Project_Status_Draft.
- Resulting document clearly marks SAC resources as optional and available on request.
Incubation
The following projects are following the OSGeo Incubation process.
Relationship with OSGeo:
- Project are expected to display the OSGeo Project in Incubation logo on their website.
- OSGeo lists these project on the main OSGeo http://www.osgeo.org website.
Relationship with Incubation Committee:
- Each project has a mentor to help answer any questions (very helpful for sensitive subjects that cannot be discussed on an open mailing list).
- Project are expected to link from the Incubation_Committee wiki to:
- A Provenance Review document (to confirm they are open source)
- A Incubation Checklist document (to meet graduation requirements)
- Incubation Committee mailing list is always available for questions and discussion
gvSIG
- mentor: Dimitris Kotzinos (taking over from Jeroen Ticheler)
- contact: Manuel Madrid (taking over from Jorge Sanz)
- gvSIG Incubation Status
- gvSIG Provenance Review
MetaCRS
- mentor: Daniel Morissette
- provenance review not provided
- checklist not provided
Opticks
- mentor: Mark Lucas
- provenance review not provided
- checlist is at 70%
OTB Project
- mentor: Landon Blake
- OTB Project Incubation Status
Update from Landon: The OTB Project continues to work through the incubation process. They should be forming a project steering committee in the next couple of months. I think we will also be doing the code review within the next few weeks.
pycsw
- mentor: Jeff McKenna
Update from Jeff: The developers are very keen to advance through the OSGeo Incubation process.
rasdaman
- mentor: Bruce Bannerman
TEAM Engine
- mentor: Justin Deolivera
ZOO-Project
- mentor: Frank Warmerdam
- ongoing provenance review.
- ongoing status document.
Labs
Thanks to Landon Blake for his excellent leadership in reaching out to OSGeo Incubation Lab projects.
Labs status update:
- TBD