SAC Meeting 2019-09
Jump to navigation
Jump to search
Where and When
- in IRC on Freenode, channel: osgeo-sac
- Web IRC client: https://webchat.freenode.net/ Thursday Sept 12th 2019 20 UTC
Meetings Happened
Status
- STATUS osgeo4 #1940 - osgeo4 has been setup with LXD, wordpress-dev, tracsvn-dev (still in progress setting up the test sites)
- wordpress - www has been moved to osgeo7, imagemagick, bcmath installed
- Setup a nightly job on osgeo4 to copy over smaller key containers from osgeo7, (nginx, wordpress,secure and larger containers weekly (nextcloud,download)
Agenda
- Performance issues left with www - website seems faster now on osgeo7 https://www.osgeo.org/projects/grass-gis/ (now loads in under 10 seconds for me, before took 45 seconds)
Alex noted that the libavatar calls are each taking a second each so that could be one bottleneck. Some images are very big
- Moving other servers - tracsvn, rest of old-www, wiki - express concerns. I'm planning to finish old-www next and then follow with wiki. tracsvn we need to do some testing on tracsvn-dev before I feel comfortable migrating
- TODO: Setup Bacula (need some thoughts on best way to go about this since osgeo7 is not setup quite the same and for some containers seems overkill to install a bacular fd client
- TODO: Wiki is old and needs to be replaced the MySQL 5.5 EOL'd a couple of years ago for one.
- TODO: 2339 Load balance download.osgeo.org using ftp.osuosl.org/osgeo/download - jef mentioned this Nginx load balancing redirect
Budget
- OSUOSL donation and FunToo donation are we set?
- FunToo submitted to monthly payment plan, did treasurer figure it out?
- OSUOSL, need to submit request to treasurer. - Request was made June 27, need confirmation
System Contracts
- DONE Regina -- Second contract in place
- LDAP+SSH Keys
- Migrating OSGeo Wiki Logins to OSGeo LDAP
Open tickets needing attention
- Domain Renewals (needs ticket) Is GDAL all set?