Search results

Jump to navigation Jump to search
Results 81 – 122 of 542
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  
  
  
  

Page title matches

Page text matches

  • * Start of 2014 we hope projects will be able to set up forks with this implementation and * At FOSS4G 2014 we might organise a benchmark on interoperability
    2 KB (296 words) - 19:00, 5 March 2014
  • The OSGeo Conference Committee votes for the 2014 hosting resulted in a tie. A re-vote did not change the outcome. The foll * available at http://svn.osgeo.org/osgeo/foss4g/proposals/2014/
    2 KB (299 words) - 12:32, 31 July 2013
  • * Barend: opzet begroting, verder uitwerken voor 2014 * 2014 Dag: moeten organizing committee hebben
    4 KB (520 words) - 14:49, 23 December 2013
  • ...f Code 2015 Improvements|2015]], [[Google Summer of Code 2014 Improvements|2014]], [[Google Summer of Code 2013 Improvements|2013]], [[Google Summer of Cod
    2 KB (262 words) - 08:36, 23 January 2019
  • Where are we at beginning of 2014?
    604 bytes (74 words) - 05:18, 23 December 2013
  • JUEVES 9 DE ENERO 2014 a las 17.00 Hrs == FOSS4G Perú 2014 ==
    5 KB (748 words) - 22:10, 21 September 2014
  • [[Panorama_SIG_Libre_2014|Volver a Panorama SIG Libre 2014]] * [http://irclogs.geoapt.com/osgeo-es/%23osgeo-es.2014-02-02.log Log de la reunión]
    2 KB (283 words) - 15:07, 2 February 2014
  • * do 11 dec 2014, 20.15 'Stichting OSGeo.nl Bestuursvergadering 18, [[Nederland/bijeenkomste * ma 1 dec 2014, 20.15 'OSGeo.nl IrC Chat, [[Nederland/bijeenkomsten/IRC20141201 | Aandacht
    13 KB (1,351 words) - 05:49, 15 March 2024
  • ...cipates in the GeoMoose PSC and MS4W projects, was a LOC member for FOSS4G 2014, and is one of the leaders of the PDXOSGEO user group.
    615 bytes (94 words) - 17:04, 22 September 2017
  • == SIGTE - University of Girona (2014 Testimonial) ==
    3 KB (495 words) - 12:39, 26 November 2017
  • == SIGTE - University of Girona (2014 Testimonial) ==
    3 KB (496 words) - 00:55, 2 September 2014
  • ...uary 2014''' at [http://www.timeanddate.com/worldclock/fixedtime.html?year=2014&month=01&day=16&hour=20&min=0&sec=0 20.00UTC] through IRC and follow up vot
    557 bytes (72 words) - 06:56, 10 January 2014
  • ...Sc. degree in Computer Engineering at Università degli Studi di Catania in 2014. In 2016 he obtained a M.Sc. in Computer Science and Engineering at Politec ...Sc. degree in Computer Engineering at Università degli Studi di Catania in 2014. In 2016 he obtained a M.Sc. in Computer Science and Engineering at Politec
    2 KB (288 words) - 11:15, 1 July 2018
  • ...Architect, [http://ecere.ca/gnosis/ GNOSIS Geo-spatial visualization SDK] (2014-present)
    1,000 bytes (126 words) - 07:01, 23 June 2018
  • This Memorandum of Understanding was approved on 16th Oct. 2014 by the OSGeo Board of Directors. ...f McKenna (OSGeo), and Chen Jun (ISPRS) meet at AfricaGEO in South Africa, 2014, to discuss partnerships.]]
    3 KB (492 words) - 12:26, 6 August 2016
  • ...meeting also features Union-wide sessions, including townhall meetings. In 2014 there were 13 such townhall meetings. ...ommunity to conduct both both oral presentations and a posters session. In 2014 there were two dedicated FOSS sessions (ESSI and Hydrology Diviisons). This
    5 KB (721 words) - 03:36, 20 March 2024
  • ...|2016]], [[Google Summer of Code 2015|2015]], [[Google Summer of Code 2014|2014]], [[GvSIG GSoC 2013 Ideas|2013]], [[GvSIG GSoC 2012 Ideas|2012]], [[GvSIG
    2 KB (296 words) - 00:35, 4 February 2019
  • ...d check [[Google Summer of Code 2015|2015]], [[Google Summer of Code 2014|2014]], [[GvSIG GSoC 2013 Ideas|2013]], [[GvSIG GSoC 2012 Ideas|2012]], [[GvSIG
    2 KB (278 words) - 05:36, 22 August 2016
  • ...http://lists.osgeo.org/pipermail/board/2014-July/011785.html vote] in July 2014. Please see [[Membership_Process]] for current procedure.''' From 2014 elections make use of an [[Electronic Voting]] process.
    5 KB (769 words) - 21:23, 24 August 2019
  • * '''Fecha''': 03/12/2014
    1 KB (142 words) - 03:04, 4 December 2014

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)